Related documents Search history  | Help
[ clip Worst-case projections show Texas power grid may come up short as soon as 2027 ]
4 document(s) related
Texas Bills & Amendments: 2
Reports: 2
| Texas Bills / Amendments | Caption | Clips |
|---|---|---|
| 89th Regular Session | ||
| SB 6 | Relating to electricity planning and infrastructure costs for large loads. | 21 |
| 88th Regular Session | ||
| HB 5066 | Relating to electricity service in areas of this state with a need for transmission projects. | 8 |
|
Reports
|
Clips |
|
|---|---|---|
Report on the capacity, demand and reserves (CDR) in the ERCOT region, 2025-2029. (Link Type: Report) |
17 | |
Effective load carrying capability study: Final report, prepared for Electric Reliability Council of Texas (ERCOT). (Link Type: Report) |
||
